Title

News (and stuff) from London E3

Saturday, 11 December 2010

Cycle Superhighway 2

CS2CS2 isn't officially due to be operational until next Summer, but the latest of Boris's bank-sponsored cycle lanes is already making an appearance. A blue stripe has been daubed along parts of Bow Road and Mile End Road over the last week or two, and bikes are already speeding their way along. Sounds great? I'm not convinced.

The road from Aldgate to Bow ought to be perfect for the addition of a dedicated cycle lane. It's relatively straight and there's plenty of room - the road's wide enough to have supported both trams and traffic back in the early 20th century. Indeed there's been a cycle lane along the road for several years, it's just wasn't as wide as Cycle Superhighways are supposed to be. The old lane was less than a metre wide, which isn't entirely conducive to feelings of safety. The new lane's the requisite metre and a half, which is much better. But you still wouldn't catch me dead using it, for fear you'd catch me dead.

Problem 1) It's still just a cycle lane. It's not segregated from the rest of the traffic at all. No thanks, not for me.

Problem 2) Bow Road is wide enough for a narrow cycle lane and two lanes of traffic. But it's not wide enough for a wide cycle lane and two lanes of traffic. All that's happened so far is that the new blue stripe has encroached on the inside lane and shrunk it, meaning it's no longer wide enough for a lorry, bus or coach. Traffic is now forced to trespass on the Cycle Superhighway because left-hand wheels have to go somewhere. As things stand, CS2 is much more likely to be full of traffic than its narrow predecessor.

Problem 3) OK, there are probably plans to repaint the existing white lines to equalise the two non-bike lanes. But I fear this would simply shrink both lanes to impractical widths too narrow for buses and broad-chassis traffic. It's therefore possible that Bow Road will, in places, be restricted to a souped-up bike lane and one lane of traffic, rather than the current two. Great for cyclists, but expect snarled-up jams of cars and lorries as the capacity of the road suddenly shrinks. We'll see.

Problem 4) As a cyclist, the one thing you really don't want to end up underneath is a bendy bus. Along Bow Road we have lots of those trundling along route 25. More importantly we have lots of enormous bus stops, increased in size six years ago to be long enough to fit two-and-a-half bendy buses. Our bus stops are a massive 45 metres long, creating corresponding 45m gaps in the blue striped Cycle Superhighway. These huge bus stops won't be required next summer when the 25 is due to revert to double decker operation. But I bet nobody at TfL thinks to shrink Bow Road's bus stops down to normal size after the bendies go, and the unnecessarily large gaps in CS2 will remain.

Problem 5) Bus stops aren't the only street features creating gaps in the Cycle Superhighway. We have a ridiculous number of pedestrian crossings along Bow Road, so the stripe regularly breaks for those. And for road junctions. And for laybys. Indeed, the newly laid Cycle Superhighway is split into at least ten separate chunks, and that's over a stretch less than a mile long. The blue lane stops starts stops starts stops starts, which ain't great. I hope there's more blue paint on its way, to link things together, otherwise this intermittent stripe is a bit rubbish.

Problem 6) TfL posted me a leaflet three months ago which promised "From Autumn 2010 a section on our webpage will be showing further details of what will be implemented, and where. We will also show details of the timing of any works which may affect local residents and businesses." It isn't there. Work has started on CS2, and nobody's telling us anything. That new layby beside St Clements Hospital, that should have been online somewhere, but it's finished already and not a mutter. Much public information was promised, but none's been delivered.

Problem 7) The Cycle Superhighway's blatantly not yet finished. I'd hope that many of the problems I've mentioned above will be sorted out before the official opening next summer. And yet someone's already been along and written "CS2" on the road at regular intervals, as if to give the fledgling Cycle Superhighway some unwarranted legitimacy. Bad thing. If it's not yet ready, don't tempt cyclists onto it.

Problem 1 again) Even when it's finished, it'll still be nothing but a souped-up cycle lane. It won't be segregated from the rest of the traffic at all, it won't be safe. No thanks, not for me.

Friday, 10 December 2010

Olympic update

London 2012  Olympic update
  Can we check your car please?


One of the interesting side-effects of living on the edge of Stratford is that the Olympic Delivery Authority sometimes send you letters. Dear Householder, they say, and then let you know about something 2012-related they plan to do on your doorstep. It'll be something that's bound to happen whatever you think, but they need to tell you about it because they have to tick the box marked "public consultation" .

Our latest local planning application is for a Vehicle Screening Area to be used during the Olympic Games in 2012. Organisers don't want any spectators turning up by car, but lots of vehicles still need to enter the park to make the Games work. Handymen to keep the place ticking over, deliveries of McDonalds burgers, visiting dignitaries in luxury coaches, that sort of thing. And it's clearly essential that none of these vehicles get inside the perimeter with a cargo of high explosive on board - hence the need for vehicle screening areas dotted around the edge of the park. We're getting one of these in Tower Hamlets. Squashed between the A12 and the River Lea, north of the mainline railway and south of Fish Island. Nowhere lovely, nowhere that'll be greatly missed. But planners still have to ask whether anybody minds, because that's the law.

You might expect that a planning application like this would be online. Well, if it is, I can't find it. I can't find it on the official ODA Planning Register, because that's an unfriendly mess with a godawful mapping interface. I can't find it on the London 2012 website's Planning Consultations page, because nobody's thought to include it there. And I can't find it on the webpage where information's held about "living near the Olympic Park". Admittedly there is a hotline telephone number to ring, but nobody's going to phone that on the off chance that there just might be plans for a Vehicle Screening Area round the corner. If I hadn't had the letter through my door, I'd never have known.

So, with zero information available online, I went along to yesterday's drop-in session at my local library. One venue, one day only - one chance to find out. There were no posters in the building, no announcements - nothing signposted. If I hadn't known the two folk in the corner were Olympic-related I'd have walked straight by. But yes, they had the plans for the screening zone out on a table and were only too happy to talk.

The entire takeover of the railway sidings and surrounding plant will be temporary, and the area will be returned to normal after the Games. There are two options, depending on whether the landowner of the northern half signs up or not. It'll be back of house vehicles parking up here, not spectators. A newly remodelled road junction will be created at the Old Ford turnoff on the A12. Really, it'll be nothing earth-shattering. Unless you're my one reader who lives virtually nextdoor, you wouldn't be interested.

But the bloke giving me the Olympic spiel let slip one particularly interesting snippet of advance information. Included amongst the many Vehicle Screening Areas there'll be one out east for Stratford's new Westfield megamall. As you might expect, shoppers driving into its multi-storey car parks during the Games should expect to be police-checked. More unexpectedly, these random screening checks will begin early, several months before the the Opening Ceremony takes place. There you'll be popping into John Lewis for an Easter gift or barbecue set, and your car might just be flagged down for an anti-terrorist once-over. The E15 police state kicks off prematurely, it seems, because security chiefs can't be too careful.

Our conversation was highly professional, and the ODA employees were able to answer all my questions. It was only after I'd turned to leave that I realised they hadn't once asked me what I thought about the plans. This had been a one-way transmission exercise, from them to me. They hadn't offered me one of their response cards piled up on the table and asked me to fill it in. They hadn't asked whether I was in favour or not, they'd just assumed. Indeed, in common with several other so-called 'consultation' events I've been to round here over the last few years, no direct consultation actually took place.

The Tower Hamlets Vehicle Screening Area will be built whatever local people think, however the authorities decide. In this particular case, that may be no bad thing. But in their general approach to public consultation and stakeholder engagement, I fear the ODA are merely ticking boxes .