Title

News (and stuff) from London E3

Saturday, 15 January 2011

Mmm, local Bow news:
• The Olympic Marathon's still not coming to Bow, despite much protest. On a similar theme, but much smaller scale, one of London 2012's directors took his team for a jog around Bow last week. Past the Bromley-by-Bow Centre, along Roman Road and around Vicky Park, before returning down the Greenway to Three Mills. And he enjoyed running around Bow so much that he blogged about it, at length. Brilliant local stuff. And yet, in praising the wonderfulness of the area for running, simultaneously incredibly bloody tactless.
• Keen-eyed viewers of Thursday's EastEnders will have spotted the platforms at Walford East making their very first on-screen appearance as Charlie Slater made his farewell from the series. Keen-eared viewers will have heard "The next station is Bow Road", which seemed finally to confirm the long-held understanding that fictional Walford East takes the place of Bromley-by-Bow on the District line. However, even keener-eyed viewers will have been disappointed to spot a Northern line train rolling into the platform. Alas it seems that all the scenes were filmed at East Finchley, umpteen miles away from E3.
• TfL have finally got round to publishing the implementation programme for the installation of Cycle Superhighway 2 between Aldgate and Bow. Worryingly it appears they think they've finished the stretch between Mile End and Bow Road stations (apart from a replacement toucan crossing to be installed next month). Sorry, but if that intermittent unsafe blue strip is supposed to be be finished, then the project's a complete joke. Work from Campbell Road to the Bow Roundabout starts on March 10th (sheesh, for 66 days), and at the roundabout itself on March 29th (for 25). No details of these final two construction packages are yet available, but I hope they're a damned sight more practical than the last attempt.
• DLR users between Bow Church and Stratford should be aware the railway will be shut next weekend, and the Sunday after, and the first two Sundays in March, and the following weekend, and the first Sunday in April, and the following weekend, and the whole of the Easter weekend, and the long May Day bank holiday weekend [full dates]. All of this is "due to Crossrail engineering works", more specifically construction of the Pudding Mill Lane Portal, so expect further regular closures between now and September 2013. In better news, Crossrail works will no longer require the diversion of two sewers in Wick Lane, meaning that Grove Hall Park will no longer need to be hijacked as as a construction site.

No comments:

Post a Comment